allan ledesma

OSU PacWave Utility Connection & Monitoring Facility

OSU PACWAVE UTILITY CONNECTION & MONITORING FACILITY HGE worked with Oregon State University’s PacWave departement to develop a state-of-the-art wave energy testing facility on the Oregon coast. The project consists of 3 buildings, 2 pre-engineered metal buildings and one traditional stick frame. Due to long lead times of the specialized medium volage electrical equipment, the …

OSU PacWave Utility Connection & Monitoring Facility Read More »

Coquille Public Library

COQUILLE PUBLIC LIBRARY Work on this project consisted of the remodel of an existing former bank building into the Coquille Public Library. An elevator and stair building addition was also part of the work, approximately 292 sf, for a total project area of 8,852 sf. Interior work included demolition, vault door removal, partitions, restroom replacement, …

Coquille Public Library Read More »

North Bay Fire Station Seismic Upgrade and Addition

NORTH BAY FIRE STATION SEISMIC UPGRADE AND ADDITION Work on this project consisted of Seismic Upgrades to the existing North Bay Fire Station and an accepted alternate bid for a building addition. Base bid work included all work related to the seismic upgrade: concrete shearwalls and footings, square tube steel, wall sheathing, siding, reroofing, insulation, …

North Bay Fire Station Seismic Upgrade and Addition Read More »