CONFEDERATED TRIBES OF SILETZ INDIANS ADMINISTRATION
The Administration Building was completed in 1995 for the Confederated Tribes of Siletz Indians. The building was designed for multi-use and features a multi-function roof. The facility is equipped with advanced light control, sound system, and media display capabilities. The building also contains small meeting spaces, a lobby space featuring display areas and reception counter, offices, staff dining room, computer room, classrooms, restrooms, vault, ATM services, and storage space. Energy efficiency was an important design criterion and the building features naturally controlled daylighting, energy efficient artificial lighting control, and passive cooling (ventilation). The building cost was $67/sq. ft. Total project cost (site, furnishing, soils, fees, etc.) was $2,500,000.
Location Siletz, OR
Completed 1995
Contractor Quade Commercial
Cost $2,500,000
Size 25,000 sq. ft.
Type New Construction